Solar · United Kingdom

Larks Green Solar Farm

Operator Enso Energy & Iron Acton Green

Operational70 MWData checked 16 November 2026Source record dated 16 May 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Larks Green Solar Farm is a 70 MW solar farm 4.5 km south-east of Thornbury, Gloucestershire, United Kingdom. Its planning application (P20/13909/F) went to South Gloucestershire on 21 August 2020 and was granted on 5 January 2021. It has been operating since 2 May 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 70 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 565 energy sites within 40 km for Larks Green Solar Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
Wholesale

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 1,535 MWh out and 21 MWh in, active 36% of half hours, peak 19 MW of 70. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £7,191 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Solar
Capacity
70 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Enso Energy & Iron Acton Green
Location
Land North and West Of Iron Acto, Iron Acton, Bristol, Avon, Gloucestershire, BS37 9TX, United Kingdom
Planning authority
South Gloucestershire
Planning application
P20/13909/F
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P20/13909/F, with what the planning evidence pack adds for this site.

Every application in South Gloucestershire · Alerts for applications and incidents near here

  • 21 August 2020 Planning application submitted
  • 5 January 2021 Planning permission granted
  • 1 December 2021 Construction started
  • 2 May 2023 Operational

None found. The register holds no published incident that names Larks Green Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Larks Green Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Larks Green Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Larks Green Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 May 2023.
Where is Larks Green Solar Farm?
4.5 km south-east of Thornbury, Gloucestershire, United Kingdom (postcode BS37 9TX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).