Solar · United Kingdom
Land West Of Hunger Hill Farm
Operator Greencoat Capital · Owner Schroder Administration Limited
Operational5 MWData checked 16 November 2026Source record dated 4 December 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land West Of Hunger Hill Farm is a 5 MW solar farm 4.6 km south-east of Darlington, County Durham, United Kingdom. Its planning application (15/00484/FUL) went to Darlington on 19 May 2015 and was granted on 13 August 2015. It has been operating since 15 February 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land West Of Hunger Hill Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
GREENCOAT CAPITAL MANAGEMENT INVESTMENT LIMITED (13055373), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Greencoat Capital
- Owner
- Schroder Administration Limited
- Location
- Land West Of Hunger Hill Farm,, Middleton St George, Brass Castle, Darlington, County Durham, DL2 1DW, United Kingdom
- Planning authority
- Darlington
- Planning application
- 15/00484/FUL
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/00484/FUL, with what the planning evidence pack adds for this site.
Every application in Darlington · Alerts for applications and incidents near here
Timeline
- 19 May 2015 Planning application submitted
- 13 August 2015 Planning permission granted
- 12 December 2016 Construction started
- 15 February 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Land West Of Hunger Hill Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land West Of Hunger Hill Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land West Of Hunger Hill Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land West Of Hunger Hill Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 December 2017.
- Where is Land West Of Hunger Hill Farm?
- 4.6 km south-east of Darlington, County Durham, United Kingdom (postcode DL2 1DW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).