Scottow Moor - RAF Coltishall Solar Farm (Phase 1)

Operator Greencoat Capital · Owner Schroder Administration Limited

Operational32 MWData checked 16 November 2026Source record dated 4 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Scottow Moor - RAF Coltishall Solar Farm (Phase 1) is a 32 MW solar farm 7.6 km south of North Walsham, Norfolk, United Kingdom. Its planning application (PF/14/1334) went to North Norfolk on 9 October 2014 and was granted on 23 December 2014. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 19 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 11 other sites and 202 energy sites within 40 km for Scottow Moor - RAF Coltishall Solar Farm (Phase 1)

Members see the sites and incidents around this one, and every record behind them.

GREENCOAT CAPITAL MANAGEMENT INVESTMENT LIMITED (13055373), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
32 MW (this record)
All phases
49.9 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Greencoat Capital
Owner
Schroder Administration Limited
Location
Former RAF Coltishall, Coltishall Airfield, Filby Road, Norwich, Norfolk, Norfolk, United Kingdom
Planning authority
North Norfolk
Planning application
PF/14/1334
First operating
2015

This record is 32 MW, one part of a site built in phases. With Scottow Moor - RAF Coltishall Solar Farm (Phase 2) (17.9 MW) the phases on the register add up to 49.9 MW. Scottow Moor - RAF Coltishall Solar Farm (Phase 2)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PF/14/1334, with what the planning evidence pack adds for this site.

Every application in North Norfolk · Alerts for applications and incidents near here

  • 9 October 2014 Planning application submitted
  • 23 December 2014 Planning permission granted
  • 15 January 2015 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Scottow Moor - RAF Coltishall Solar Farm (Phase 1). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Scottow Moor - RAF Coltishall Solar Farm (Phase 1) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Scottow Moor - RAF Coltishall Solar Farm (Phase 1); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Scottow Moor - RAF Coltishall Solar Farm (Phase 1)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2017.
Where is Scottow Moor - RAF Coltishall Solar Farm (Phase 1)?
7.6 km south of North Walsham, Norfolk, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).