Solar · United Kingdom

Land at Wrigley Head

Operator Oldham Metropolitan Borough Council

Under Construction0.9 MWData checked 16 November 2026Source record dated 30 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Wrigley Head is a 0.9 MW solar farm in Hollinwood, Greater Manchester, United Kingdom. Its planning application (PA/344623/20) went to Oldham on 5 March 2020 and was granted on 17 December 2021. Construction started on 1 March 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 119 other energy sites within 10 km, 76 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land at Wrigley Head sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school24 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof39 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent50 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Oldham Metropolitan Borough Council
Location
Land at, Wrigley Head, Failsworth, Manchester, Greater Manchester, M35, United Kingdom
Planning authority
Oldham
Planning application
PA/344623/20

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA/344623/20, with what the planning evidence pack adds for this site.

Every application in Oldham · Alerts for applications and incidents near here

  • 5 March 2020 Planning application submitted
  • 17 December 2021 Planning permission granted
  • 1 March 2026 Construction started

None found. The register holds no published incident that names Land at Wrigley Head. If you know of one, report it (confidential reports are anonymised).

Has Land at Wrigley Head had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Wrigley Head; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Wrigley Head?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2026.
Where is Land at Wrigley Head?
In Hollinwood, Greater Manchester, United Kingdom (postcode M35).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).