← Back to Cleveland

Solar · United Kingdom

Land at Woodhouse Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 24 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Woodhouse Farm is a 5 MW solar farm in Guisborough, Cleveland, United Kingdom. Its planning application (R/2015/0328/FFM) went to Redcar and Cleveland on 21 May 2015 and was granted on 24 November 2015. It has been operating since 24 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 39 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 267 energy sites within 40 km for Land at Woodhouse Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land at Woodhouse Farm, Middlesbrough Road, Guisborough, Cleveland, TS14 6QU, United Kingdom
Planning authority
Redcar and Cleveland
Planning application
R/2015/0328/FFM
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for R/2015/0328/FFM, with what the planning evidence pack adds for this site.

Every application in Redcar and Cleveland · Alerts for applications and incidents near here

  • 21 May 2015 Planning application submitted
  • 24 November 2015 Planning permission granted
  • 20 January 2016 Construction started
  • 24 March 2016 Operational

None found. The register holds no published incident that names Land at Woodhouse Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Woodhouse Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Woodhouse Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Woodhouse Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 August 2016.
Where is Land at Woodhouse Farm?
In Guisborough, Cleveland, United Kingdom (postcode TS14 6QU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).