Onshore wind · United Kingdom
Land at Overside and Greenwellheads Farms
Operator Greenside Wind Energy Ltd
Operational9.2 MWData checked 16 November 2026Source record dated 9 December 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land at Overside and Greenwellheads Farms is a 9.2 MW wind farm 11 km north-west of Peterhead, Grampian, United Kingdom. Its planning application (APP/2011/1024) went to Aberdeenshire on 30 March 2011 and was granted on 13 September 2011. It has been operating since 1 November 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Land at Overside and Greenwellheads Farms changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 9.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Greenside Wind Energy Ltd
- Location
- Crimond, Fraserburgh, AB42 3HJ, Grampian, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2011/1024
- First operating
- 2013
- Turbines
- 4
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2011/1024, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 30 March 2011 Planning application submitted
- 13 September 2011 Planning permission granted
- 1 November 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Land at Overside and Greenwellheads Farms. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land at Overside and Greenwellheads Farms had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land at Overside and Greenwellheads Farms; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Land at Overside and Greenwellheads Farms?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 December 2013.
- Where is Land at Overside and Greenwellheads Farms?
- 11 km north-west of Peterhead, Grampian, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).