Solar · United Kingdom

Bilbo Solar Farm

Operator Green Energy International

Under Construction36.6 MWData checked 16 November 2026Source record dated 8 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bilbo Solar Farm is a 36.6 MW solar farm 12 km north-west of Peterhead, Aberdeenshire, United Kingdom. Its planning application (APP/2019/0296) went to Aberdeenshire on 26 June 2019 and was granted on 15 November 2019. Construction started on 1 December 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 28 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

GREEN ENERGY INTERNATIONAL LIMITED (10086572), active, since 2016. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bilbo Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 130 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie130 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline193 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School247 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
36.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Green Energy International
Location
Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, Aberdeenshire, AB43 8QJ, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2019/0296

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2019/0296, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 26 June 2019 Planning application submitted
  • 15 November 2019 Planning permission granted
  • 1 December 2020 Construction started

None found. The register holds no published incident that names Bilbo Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Bilbo Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bilbo Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bilbo Solar Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2024.
Where is Bilbo Solar Farm?
12 km north-west of Peterhead, Aberdeenshire, United Kingdom (postcode AB43 8QJ).