Solar · Spain

La Revuelta solar farm

Planned (permitted)108 MWChecked 8 October 2026Last changed in the dataset 21 April 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for La Revuelta solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
108 MW
Status
Planned (permitted) (Pre-construction)
Operator
Enel Green Power España
Owner
Enel SpA
Location
Manzanares, Ciudad Real, Castilla-La Mancha, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names La Revuelta solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.