Planning pack for this site, £295Other options

Battery storage · Germany

Kyon-100 Battery Storage

Operator Kyon-100 Battery Storage GmbH

Planned20 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kyon-100 Battery Storage is a 20 MW battery storage site 11 km west of Tarp, Großenwiehe, Schleswig-Flensburg, Schleswig-Holstein, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 128 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kyon-100 Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-1586, Third battery fire at Suncycle site in Thuringia, 437 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15862024Third battery fire at Suncycle site in Thuringia437 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre437 kmSignificant
EIR-00972026Battery storage fire in Bautzen, Germany prompts local evacuations522 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 46.2 MWh, Lithium-Batterie)
Capacity
20 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Kyon-100 Battery Storage GmbH
Location
Großenwiehe, Schleswig-Flensburg, Schleswig-Holstein, 24969, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Kyon-100 Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Kyon-100 Battery Storage had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Kyon-100 Battery Storage; it holds 17 incidents at battery storage sites in Germany.
What is the status of Kyon-100 Battery Storage?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Kyon-100 Battery Storage?
11 km west of Tarp, Großenwiehe, Schleswig-Flensburg, Schleswig-Holstein, Germany (postcode 24969).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).