Planning pack for this site, £295Other options

Solar · United Kingdom

Kingston International Business Park, Somerden Road - Soalr Panels

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 22 September 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kingston International Business Park, Somerden Road - Soalr Panels is a 0.2 MW solar farm 3.5 km west of Hedon, East Riding of Yorkshire, United Kingdom. Its planning application (26/00610/PAAP) went to Kingston upon Hull, City of on 4 June 2026 and was granted on 4 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kingston International Business Park, Somerden Road - Soalr Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 57 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton57 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster57 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine87 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Location
Excel Laminating Ltd Unit 3 Kingston International Business Park Somerden Road, East Riding of Yorkshire, HU9 5NX, United Kingdom
Planning authority
Kingston upon Hull, City of
Planning application
26/00610/PAAP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00610/PAAP, with what the planning evidence pack adds for this site.

Every application in Kingston upon Hull, City of · Alerts for applications and incidents near here

  • 4 June 2026 Planning application submitted
  • 4 August 2026 Planning permission granted
  • 4 August 2029 Planning permission runs out

None found. The register holds no published incident that names Kingston International Business Park, Somerden Road - Soalr Panels. If you know of one, report it (confidential reports are anonymised).

Has Kingston International Business Park, Somerden Road - Soalr Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kingston International Business Park, Somerden Road - Soalr Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kingston International Business Park, Somerden Road - Soalr Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 September 2026.
Where is Kingston International Business Park, Somerden Road - Soalr Panels?
3.5 km west of Hedon, East Riding of Yorkshire, United Kingdom (postcode HU9 5NX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).