Onshore wind · United Kingdom
Kinegar Quarry
Operator Wind Direct · Owner Infinite Renewables LTD
Revised5 MWData checked 16 November 2026Source record dated 3 July 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kinegar Quarry is a 5 MW wind farm 12 km south-east of Dunbar, Borders, United Kingdom. Its planning application (10/00364/FUL) went to Scottish Borders on 12 March 2010 and was refused on 15 September 2010. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 31 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Kinegar Quarry changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
WIND DIRECT LIMITED (07335848), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kinegar Quarry sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0441, Wind turbine collapses at Aviva's Pitheavlis site in Perth, 84 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0441 | 2025 | Wind turbine collapses at Aviva's Pitheavlis site in Perth | 84 km | Significant |
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 93 km | Minor |
| EIR-0911 | 2017 | Worker dies after fall from turbine at Whitelee windfarm near Glasgow | 121 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Wind Direct
- Owner
- Infinite Renewables LTD
- Location
- Land South West Of Neuk Farm, Cockburnspath, Borders, United Kingdom
- Planning authority
- Scottish Borders
- Planning application
- 10/00364/FUL
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/00364/FUL, with what the planning evidence pack adds for this site.
Every application in Scottish Borders · Alerts for applications and incidents near here
Timeline
- 12 March 2010 Planning application submitted
- 15 September 2010 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Kinegar Quarry. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Kinegar Quarry had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Kinegar Quarry; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Kinegar Quarry?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 3 July 2014.
- Where is Kinegar Quarry?
- 12 km south-east of Dunbar, Borders, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).