Onshore wind · United Kingdom
Ferneylea Farm
Operator CBK Galbraith
Operational1.5 MWData checked 16 November 2026Source record dated 4 May 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ferneylea Farm is a 1.5 MW wind farm 11 km south-east of Dunbar, East Lothian, United Kingdom. Its planning application (10/00769/P) went to East Lothian on 21 September 2010 and was granted on appeal on 26 September 2012. It has been operating since 1 January 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 40 other energy sites within 10 km, 24 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Ferneylea Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- CBK Galbraith
- Location
- Ferneylea Farm, Cockburnspath, East Lothian, TD13 5YN, United Kingdom
- Planning authority
- East Lothian
- Planning application
- 10/00769/P
- Appeal reference
- PPA-210-2025
- First operating
- 2015
- Turbines
- 2, 71 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/00769/P, with what the planning evidence pack adds for this site.
Every application in East Lothian · Alerts for applications and incidents near here
Timeline
- 21 September 2010 Planning application submitted
- 7 March 2012 Planning permission granted
- 1 May 2012 Appeal lodged
- 26 September 2012 Appeal granted
- 1 December 2014 Construction started
- 1 January 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Ferneylea Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Ferneylea Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ferneylea Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Ferneylea Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 May 2017.
- Where is Ferneylea Farm?
- 11 km south-east of Dunbar, East Lothian, United Kingdom (postcode TD13 5YN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).