← Back to East Lothian
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Thorntonloch, Innerwick - Branxton Energy Storage Facility

Operator EastCoastGridServices Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 9 January 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Thorntonloch, Innerwick - Branxton Energy Storage Facility is a battery storage site 8.5 km south-east of Dunbar, East Lothian, United Kingdom. Its planning application (ECU00004659) went to Scottish Government (S36) on 17 November 2022 and was granted on 19 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Thorntonloch, Innerwick - Branxton Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 287 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool287 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells326 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire472 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EastCoastGridServices Limited
Location
Thorntonloch, E/O Innerwick, Dunbar, East Lothian, EH42 1QT, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004659

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004659, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 17 November 2022 Planning application submitted
  • 19 December 2023 Planning permission granted
  • 19 December 2028 Planning permission runs out

None found. The register holds no published incident that names Thorntonloch, Innerwick - Branxton Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Thorntonloch, Innerwick - Branxton Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Thorntonloch, Innerwick - Branxton Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Thorntonloch, Innerwick - Branxton Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 January 2024.
Where is Thorntonloch, Innerwick - Branxton Energy Storage Facility?
8.5 km south-east of Dunbar, East Lothian, United Kingdom (postcode EH42 1QT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).