← Back to Hampshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Kiln Fields Solar Farm

Operator Enviromena Asset Management UK Limited · Owner Enviromena Limited

Under Construction17.9 MWData checked 16 November 2026Source record dated 23 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kiln Fields Solar Farm is a 17.9 MW solar farm 4.8 km north of Hook, Hampshire, United Kingdom. Its planning application (21/02749/FUL) went to Hart on 10 November 2021 and was granted on 20 December 2021. Construction started on 1 July 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 46 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ENVIROMENA ASSET MANAGEMENT UK LIMITED (11225654), active, since 2018. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kiln Fields Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 8.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing8.6 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet11 kmSignificant
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End34 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
17.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Enviromena Asset Management UK Limited
Owner
Enviromena Limited
Location
Lying To The N/O Vicarage Lane, Hound Green, Hook, Hampshire, RG27 8LH, United Kingdom
Planning authority
Hart
Planning application
21/02749/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/02749/FUL, with what the planning evidence pack adds for this site.

Every application in Hart · Alerts for applications and incidents near here

  • 10 November 2021 Planning application submitted
  • 20 December 2021 Planning permission granted
  • 1 July 2023 Construction started

None found. The register holds no published incident that names Kiln Fields Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Kiln Fields Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kiln Fields Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kiln Fields Solar Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 January 2024.
Where is Kiln Fields Solar Farm?
4.8 km north of Hook, Hampshire, United Kingdom (postcode RG27 8LH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).