← Back to Hampshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Bartley Wood Business Park - Solar panels

Operator PCP IV Alpha Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 23 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bartley Wood Business Park - Solar panels is a 0.2 MW solar farm in Hook, Hampshire, United Kingdom. Its planning application (23/01061/GPDSND) went to Hart on 15 May 2023 and was granted on 31 July 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bartley Wood Business Park - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 6.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing6.6 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet8.1 kmSignificant
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End38 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
PCP IV Alpha Limited
Location
17 Bartley Wood Business Park, Form One Bartley Way, Hook, Hampshire, RG27 9XA, United Kingdom
Planning authority
Hart
Planning application
23/01061/GPDSND

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01061/GPDSND, with what the planning evidence pack adds for this site.

Every application in Hart · Alerts for applications and incidents near here

  • 15 May 2023 Planning application submitted
  • 31 July 2023 Planning permission granted

None found. The register holds no published incident that names Bartley Wood Business Park - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Bartley Wood Business Park - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bartley Wood Business Park - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bartley Wood Business Park - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2023.
Where is Bartley Wood Business Park - Solar panels?
In Hook, Hampshire, United Kingdom (postcode RG27 9XA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).