Solar · United Kingdom

Ketton solar farm - phase 2

Operator Lark Energy · Owner Kingfisher Ventures Limited

Operational3 MWData checked 16 November 2026Source record dated 17 March 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ketton solar farm - phase 2 is a 3 MW solar farm 5.1 km west of Stamford, Leicestershire, United Kingdom. Its planning application (2014/0025/FUL) went to Rutland on 9 January 2014 and was granted on 25 April 2014. It has been operating since 10 January 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 32 other sites and 367 energy sites within 40 km for Ketton solar farm - phase 2

Members see the sites and incidents around this one, and every record behind them.

LARK ENERGY LIMITED (10760734), dissolved, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3 MW (this record)
All phases
12 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lark Energy
Owner
Kingfisher Ventures Limited
Location
North Field, Off Pit Lane, Ketton, Stamford, Lincolnshire, Leicestershire, PE9 3SZ, United Kingdom
Planning authority
Rutland
Planning application
2014/0025/FUL
First operating
2015

This record is 3 MW, one part of a site built in phases. With Ketton solar farm (9 MW) the phases on the register add up to 12 MW. Ketton solar farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2014/0025/FUL, with what the planning evidence pack adds for this site.

Every application in Rutland · Alerts for applications and incidents near here

  • 9 January 2014 Planning application submitted
  • 25 April 2014 Planning permission granted
  • 1 August 2014 Construction started
  • 10 January 2015 Operational

None found. The register holds no published incident that names Ketton solar farm - phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ketton solar farm - phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ketton solar farm - phase 2; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ketton solar farm - phase 2?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 March 2015.
Where is Ketton solar farm - phase 2?
5.1 km west of Stamford, Leicestershire, United Kingdom (postcode PE9 3SZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).