Battery storage · Germany
Kettenheim BESS
Operator juwi Wind Germany 267 GmbH & Co. KG
Planned10 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kettenheim BESS is a 10 MW battery storage site 3.2 km south-east of Alzey, Kettenheim, Alzey-Worms, Rheinland-Pfalz, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 70 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 17 incidents at battery storage sites (hybrid battery and solar sites included) in Germany, and 199 worldwide.
Get an email when Kettenheim BESS changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kettenheim BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-1586, Third battery fire at Suncycle site in Thuringia, 244 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1586 | 2024 | Third battery fire at Suncycle site in Thuringia | 244 km | Significant |
| EIR-2437 | 2024 | Battery container fire causes EUR 700,000 damage at German test centre | 244 km | Significant |
| EIR-2478 | 2026 | Battery storage unit fire releases gases in Obernzell, Germany | 418 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Usable capacity 28.3 MWh, Lithium-Batterie)
- Capacity
- 10 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- juwi Wind Germany 267 GmbH & Co. KG
- Location
- Kettenheim, Alzey-Worms, Rheinland-Pfalz, 55234, Germany
- First operating
- 2027
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Kettenheim BESS. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Kettenheim BESS had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Kettenheim BESS; it holds 17 incidents at battery storage sites (hybrid battery and solar sites included) in Germany.
- What is the status of Kettenheim BESS?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Kettenheim BESS?
- 3.2 km south-east of Alzey, Kettenheim, Alzey-Worms, Rheinland-Pfalz, Germany (postcode 55234).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).