← Back to Thüringen
Planning pack for this site, £295Other options

Battery storage · Germany

KAP Diedorf

Operator EcoEnergy Solutions LLC

Planned10 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

KAP Diedorf is a 10 MW battery storage site 19 km south-west of Bad Salzungen, Dermbach, Wartburgkreis, Thüringen, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There is one other energy site within 10 km. The register holds no incident at this site. It holds 17 incidents at battery storage sites (hybrid battery and solar sites included) in Germany, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for KAP Diedorf sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-1586, Third battery fire at Suncycle site in Thuringia, 69 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15862024Third battery fire at Suncycle site in Thuringia69 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre69 kmSignificant
EIR-00972026Battery storage fire in Bautzen, Germany prompts local evacuations307 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 30 MWh, Lithium-Batterie)
Capacity
10 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
EcoEnergy Solutions LLC
Location
Dermbach, Wartburgkreis, Thüringen, 36466, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names KAP Diedorf. If you know of one, report it (confidential reports are anonymised).

Has KAP Diedorf had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names KAP Diedorf; it holds 17 incidents at battery storage sites (hybrid battery and solar sites included) in Germany.
What is the status of KAP Diedorf?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is KAP Diedorf?
19 km south-west of Bad Salzungen, Dermbach, Wartburgkreis, Thüringen, Germany (postcode 36466).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).