Around this site

← Back to Jiangxi

Solar · China

Jiangxi Nanchang Jiangxiang Sandong Lake solar farm

Operational135 MWChecked 8 October 2026Last changed in the dataset 30 July 2024

Technology
Solar
Capacity
135 MW
Status
Operational (Operating)
Operator
Nanchang Tongshang New Energy
Owner
Huaneng Jiangxi Clean Energy Co Ltd [100%]
Location
Jiangxiang Town, Nanchang, Jiangxi, China
First operating
2020
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Jiangxi Nanchang Jiangxiang Sandong Lake solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.