Solar · China

Inner Mongolia Qahar Right Middle Banner (Huadian) Thermal Power Plant Flexible Operation solar farm

Operational90 MWChecked 8 October 2026Last changed in the dataset 14 August 2025

Technology
Solar
Capacity
90 MW
Status
Operational (Operating)
Owner
Inner Mongolia Huadian Huitengxile Wind Power Co Ltd
Location
Ulanqab, Inner Mongolia, China
First operating
2025

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Inner Mongolia Qahar Right Middle Banner (Huadian) Thermal Power Plant Flexible Operation solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.