Solar · China

Inner Mongolia Kubuqi Desert (North) wind and solar megabase

Operational8200 MWChecked 8 October 2026Last changed in the dataset 6 November 2025

Technology
Solar
Capacity
8200 MW
Status
Operational (Operating)
Operator
Three Gorges Mengneng Energy
Owner
Three Gorges On-Land New Energy Investment Co Ltd [56%]; Inner Mongolia Energy and Electric Power Investment Group Ltd. [44%]
Location
Ordos, Inner Mongolia, China
First operating
2023
Phases in the tracker
4

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Inner Mongolia Kubuqi Desert (North) wind and solar megabase. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.