Independent Quarries

Operator The Crown Estate and Albion Stone

Abandoned3 MWData checked 16 November 2026Source record dated 14 December 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Independent Quarries is a 3 MW solar farm on the edge of Portland, Dorset, United Kingdom. Its planning application (WP/15/00039/FUL) went to Dorset on 16 February 2015 and was granted on 30 September 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 21 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

121 energy sites within 40 km for Independent Quarries

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
The Crown Estate and Albion Stone
Location
Independent Quarries, Easton Lane, Portland, Dorset, Dorset, DT5 1BW, United Kingdom
Planning authority
Dorset
Planning application
WP/15/00039/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WP/15/00039/FUL, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 16 February 2015 Planning application submitted
  • 30 September 2015 Planning permission granted
  • 30 September 2027 Planning permission runs out

None found. The register holds no published incident that names Independent Quarries. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Independent Quarries had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Independent Quarries; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Independent Quarries?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 14 December 2018.
Where is Independent Quarries?
On the edge of Portland, Dorset, United Kingdom (postcode DT5 1BW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).