Around this site

← Back to Andalucía

Solar · Spain

Huévar solar farm

Planned (permitted)88 MWChecked 8 October 2026Last changed in the dataset 17 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Huévar solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
88 MW
Status
Planned (permitted) (Pre-construction)
Operator
Palintere
Owner
Grupo Lorte [100%]
Location
Huévar del Aljarafe, Sevilla, Andalucía, Spain
Phases in the tracker
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Huévar solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.