Solar · China
Hubei Zhongxiang Duodao District (Guoneng) solar project
Operational200 MWChecked 8 October 2026Last changed in the dataset 24 July 2023
The site
- Technology
- Solar
- Capacity
- 200 MW
- Status
- Operational (Operating)
- Operator
- Guoneng Changyuan Zhongxiang New Energy
- Owner
- CHN ENERGY Changyuan Electric Power Co Ltd [65%]; China Electric Power Engineering Consulting Group Zhongnan Electric Power Design Institute Co Ltd [35%]
- Location
- Macheng Town, Jingmen, Hubei, China
- First operating
- 2023
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Hubei Zhongxiang Duodao District (Guoneng) solar project. If you know of one, report it (confidential reports are anonymised).
Follow Hubei Zhongxiang Duodao District (Guoneng) solar project
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.