Solar · United Kingdom

Home Farm, Hursley Park Road - Solar Panels

Operator Clean Energy Capital (CEC) Limited

Awaiting Construction5 MWData checked 16 November 2026Source record dated 10 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Home Farm, Hursley Park Road - Solar Panels is a 5 MW solar farm 6 km north-east of North Baddesley, Hampshire, United Kingdom. Its planning application (25/00360/FUL) went to Winchester on 17 October 2024 and was granted on 26 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Home Farm, Hursley Park Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1534, Storm Eunice loosens solar panels on Eastleigh flats, 7.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats7.7 kmMinor
EIR-15292023Fire contained to solar panels on Gosport flats roof33 kmMinor
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says35 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Clean Energy Capital (CEC) Limited
Location
Home Farm Hursley Park Road Hursley, Hampshire, SO21 2JL, United Kingdom
Planning authority
Winchester
Planning application
25/00360/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00360/FUL, with what the planning evidence pack adds for this site.

Every application in Winchester · Alerts for applications and incidents near here

  • 17 October 2024 Planning application submitted
  • 26 June 2025 Planning permission granted
  • 26 June 2028 Planning permission runs out

None found. The register holds no published incident that names Home Farm, Hursley Park Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Home Farm, Hursley Park Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Home Farm, Hursley Park Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Home Farm, Hursley Park Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2025.
Where is Home Farm, Hursley Park Road - Solar Panels?
6 km north-east of North Baddesley, Hampshire, United Kingdom (postcode SO21 2JL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).