← Back to Hampshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Silkstead Farm, Poles Lane - Battery Energy Storage System

Operator Winchester Energy Reserve Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Silkstead Farm, Poles Lane - Battery Energy Storage System is a 49.9 MW battery storage site 5.9 km north of Eastleigh, Hampshire, United Kingdom. Its planning application (24/01007/FUL) went to Winchester on 5 June 2024 and was granted on 13 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

WINCHESTER ENERGY RESERVE LIMITED (12286512), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Silkstead Farm, Poles Lane - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 87 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire87 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction134 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter151 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Winchester Energy Reserve Limited
Location
Silkstead Farm, Poles Lane, Hursley, Winchester, Hampshire, SO21 2LG, United Kingdom
Planning authority
Winchester
Planning application
24/01007/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01007/FUL, with what the planning evidence pack adds for this site.

Every application in Winchester · Alerts for applications and incidents near here

  • 5 June 2024 Planning application submitted
  • 13 March 2025 Planning permission granted

None found. The register holds no published incident that names Silkstead Farm, Poles Lane - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Silkstead Farm, Poles Lane - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Silkstead Farm, Poles Lane - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Silkstead Farm, Poles Lane - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Silkstead Farm, Poles Lane - Battery Energy Storage System?
5.9 km north of Eastleigh, Hampshire, United Kingdom (postcode SO21 2LG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).