IBM Hursley - Battery Storage

Operator IBM UK Limited

Awaiting Construction1.5 MWData checked 16 November 2026Source record dated 8 July 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

IBM Hursley - Battery Storage is a 1.5 MW battery storage site 6.4 km north-east of North Baddesley, Hampshire, United Kingdom. Its planning application (23/02836/FUL) went to Winchester on 8 March 2024 and was granted on 19 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for IBM Hursley - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 85 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire85 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction136 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter149 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
IBM UK Limited
Location
IBM Limited, IBM Hursley, Winchester, Hampshire, SO21 2JN, United Kingdom
Planning authority
Winchester
Planning application
23/02836/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/02836/FUL, with what the planning evidence pack adds for this site.

Every application in Winchester · Alerts for applications and incidents near here

  • 8 March 2024 Planning application submitted
  • 19 June 2024 Planning permission granted

None found. The register holds no published incident that names IBM Hursley - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has IBM Hursley - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names IBM Hursley - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of IBM Hursley - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2024.
Where is IBM Hursley - Battery Storage?
6.4 km north-east of North Baddesley, Hampshire, United Kingdom (postcode SO21 2JN).