Solar · United Kingdom

Hill Top Farm

Operator RG and RJ Allen Ltd

Planning Permission Expired2.5 MWData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hill Top Farm is a 2.5 MW solar farm 7.4 km north-east of Oakham, Leicestershire, United Kingdom. Its planning application (2013/0688/MAJ) went to Rutland on 16 August 2013 and was granted on 11 November 2013. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 13 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

439 energy sites within 40 km for Hill Top Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
RG and RJ Allen Ltd
Location
Hill Top Farm, Main Street, Barrow, OAKHAM, Rutland, Leicestershire, LE15 7PE, United Kingdom
Planning authority
Rutland
Planning application
2013/0688/MAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2013/0688/MAJ, with what the planning evidence pack adds for this site.

Every application in Rutland · Alerts for applications and incidents near here

  • 16 August 2013 Planning application submitted
  • 11 November 2013 Planning permission granted
  • 11 November 2016 Planning permission expired

None found. The register holds no published incident that names Hill Top Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hill Top Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hill Top Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hill Top Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Hill Top Farm?
7.4 km north-east of Oakham, Leicestershire, United Kingdom (postcode LE15 7PE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).