Solar · United Kingdom
Ranksborough Farm
Operator Elgin Energy · Owner Porto Holdings Limited
Awaiting Construction28 MWData checked 16 November 2026Source record dated 16 April 2021
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ranksborough Farm is a 28 MW solar farm 3.6 km north-west of Oakham, Leicestershire, United Kingdom. Its planning application (2019/1249/MAF) went to Rutland on 7 November 2019 and was granted on 13 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Ranksborough Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ELGIN ENERGY HOLDINGS LIMITED (07181686), active, since 2010. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ranksborough Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 20 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2151 | 2018 | Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge | 20 km | Significant |
| EIR-1265 | 2024 | Solar panels catch fire and destroy three buildings in Harby | 22 km | Significant |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 25 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 28 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Elgin Energy
- Owner
- Porto Holdings Limited
- Location
- Land At Ranksborough Farm, Melton Road, Langham, Oakham, Leicestershire, LE15 7EJ, United Kingdom
- Planning authority
- Rutland
- Planning application
- 2019/1249/MAF
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2019/1249/MAF, with what the planning evidence pack adds for this site.
Every application in Rutland · Alerts for applications and incidents near here
Timeline
- 7 November 2019 Planning application submitted
- 13 January 2022 Planning permission granted
- 31 January 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Ranksborough Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Ranksborough Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ranksborough Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Ranksborough Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 April 2021.
- Where is Ranksborough Farm?
- 3.6 km north-west of Oakham, Leicestershire, United Kingdom (postcode LE15 7EJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).