Planning pack for this site, £295Other options

Solar · United Kingdom

Ranksborough Farm

Operator Elgin Energy · Owner Porto Holdings Limited

Awaiting Construction28 MWData checked 16 November 2026Source record dated 16 April 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ranksborough Farm is a 28 MW solar farm 3.6 km north-west of Oakham, Leicestershire, United Kingdom. Its planning application (2019/1249/MAF) went to Rutland on 7 November 2019 and was granted on 13 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ELGIN ENERGY HOLDINGS LIMITED (07181686), active, since 2010. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ranksborough Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge20 kmSignificant
EIR-12652024Solar panels catch fire and destroy three buildings in Harby22 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property25 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
28 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elgin Energy
Owner
Porto Holdings Limited
Location
Land At Ranksborough Farm, Melton Road, Langham, Oakham, Leicestershire, LE15 7EJ, United Kingdom
Planning authority
Rutland
Planning application
2019/1249/MAF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2019/1249/MAF, with what the planning evidence pack adds for this site.

Every application in Rutland · Alerts for applications and incidents near here

  • 7 November 2019 Planning application submitted
  • 13 January 2022 Planning permission granted
  • 31 January 2025 Planning permission expired

None found. The register holds no published incident that names Ranksborough Farm. If you know of one, report it (confidential reports are anonymised).

Has Ranksborough Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ranksborough Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ranksborough Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 April 2021.
Where is Ranksborough Farm?
3.6 km north-west of Oakham, Leicestershire, United Kingdom (postcode LE15 7EJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).