Solar · United Kingdom

Highwood Farm

Operator Highwood Farm

Planning Permission Expired1.3 MWData checked 16 November 2026Source record dated 5 August 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Highwood Farm is a 1.3 MW solar farm 3.2 km north of Brandon, Warwickshire, United Kingdom. Its planning application (R16/0174) went to Rugby on 14 April 2016 and was granted on 7 June 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 56 other energy sites within 10 km, 44 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

608 energy sites within 40 km for Highwood Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Highwood Farm
Location
Highwood Farm, Coventry Road, Brinklow, Rugby, Warwickshire, CV23 0NJ, United Kingdom
Planning authority
Rugby
Planning application
R16/0174

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for R16/0174, with what the planning evidence pack adds for this site.

Every application in Rugby · Alerts for applications and incidents near here

  • 14 April 2016 Planning application submitted
  • 7 June 2016 Planning permission granted
  • 7 June 2019 Planning permission expired

None found. The register holds no published incident that names Highwood Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Highwood Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Highwood Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Highwood Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2020.
Where is Highwood Farm?
3.2 km north of Brandon, Warwickshire, United Kingdom (postcode CV23 0NJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).