Planning pack for this site, £295Other options

Battery storage · United Kingdom

T Main Road, Ansty - Battery Energy Storage System

Operator FRV Tyler Hill BESS 1 Ltd · Owner Frv Tyler Hill BESS 1 Limited

Awaiting Construction200 MWData checked 16 November 2026Source record dated 24 September 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

T Main Road, Ansty - Battery Energy Storage System is a 200 MW battery storage site 5.2 km south-east of Bedworth, West Midlands, United Kingdom. Its planning application (R24/0010) went to Rugby on 12 February 2024 and was granted on 12 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for T Main Road, Ansty - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 77 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells77 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire89 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool146 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
200 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
FRV Tyler Hill BESS 1 Ltd
Owner
Frv Tyler Hill BESS 1 Limited
Location
Main Road, Ansty, West Midlands, CV7 9HZ, United Kingdom
Planning authority
Rugby
Planning application
R24/0010

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for R24/0010, with what the planning evidence pack adds for this site.

Every application in Rugby · Alerts for applications and incidents near here

  • 12 February 2024 Planning application submitted
  • 12 September 2024 Planning permission granted
  • 11 September 2027 Planning permission runs out

None found. The register holds no published incident that names T Main Road, Ansty - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has T Main Road, Ansty - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names T Main Road, Ansty - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of T Main Road, Ansty - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 September 2024.
Where is T Main Road, Ansty - Battery Energy Storage System?
5.2 km south-east of Bedworth, West Midlands, United Kingdom (postcode CV7 9HZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).