Around this site

← Back to Henan

Solar · China

Henan Province Pingdingshan Baofeng County Poverty Alleviation solar farm

Operational100 MWChecked 8 October 2026Last changed in the dataset 1 March 2022

Technology
Solar
Capacity
100 MW
Status
Operational (Operating)
Operator
Baofeng Xintai Photovoltaic Power Technology Development
Owner
Jiangshan Yongtai Investment Holdings Co Ltd [50%]; Baofeng Baoxin Industrial Co Ltd [50%]
Location
Guanyintang Forestry Work Station, Pingdingshan, Henan, China
First operating
2016

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Henan Province Pingdingshan Baofeng County Poverty Alleviation solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.