Planning pack for this site, £295Other options

Battery storage · Germany

HB - Lachendorf Im Bulloh - BESS

Operator Norddeutscher Energiekontor GmbH

Planned2 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

HB - Lachendorf Im Bulloh - BESS is a 2 MW battery storage site in Lachendorf, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 19 other energy sites within 10 km. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for HB - Lachendorf Im Bulloh - BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-1586, Third battery fire at Suncycle site in Thuringia, 199 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15862024Third battery fire at Suncycle site in Thuringia199 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre199 kmSignificant
EIR-00972026Battery storage fire in Bautzen, Germany prompts local evacuations330 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 4.2 MWh, Lithium-Batterie)
Capacity
2 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Norddeutscher Energiekontor GmbH
Location
Lachendorf, Celle, Niedersachsen, 29331, Germany
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names HB - Lachendorf Im Bulloh - BESS. If you know of one, report it (confidential reports are anonymised).

Has HB - Lachendorf Im Bulloh - BESS had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names HB - Lachendorf Im Bulloh - BESS; it holds 17 incidents at battery storage sites in Germany.
What is the status of HB - Lachendorf Im Bulloh - BESS?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is HB - Lachendorf Im Bulloh - BESS?
In Lachendorf, Germany (postcode 29331).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).