Solar · China
Guangdong Taishan Haiyan Huaqiao Farm solar farm
Operational300 MWChecked 8 October 2026Last changed in the dataset 3 March 2023
The site
- Technology
- Solar
- Capacity
- 300 MW
- Status
- Operational (Operating)
- Operator
- Guangdong Jiangmen Hengguang Phase II New Energy Co. Ltd.
- Owner
- Guangdong Yide New Energy Development Co. Ltd. [10%]; China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. [35%]; Guangzhou Hengyun Enterprise Group Co Ltd [
- Location
- Haiyan Town, Jiangmen, Guangdong, China
- First operating
- 2022
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Guangdong Taishan Haiyan Huaqiao Farm solar farm. If you know of one, report it (confidential reports are anonymised).
Follow Guangdong Taishan Haiyan Huaqiao Farm solar farm
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.