Solar · Spain

Grijota solar farm

Operational271 MWChecked 8 October 2026Last changed in the dataset 5 January 2026

Technology
Solar
Capacity
271 MW
Status
Operational (Operating)
Operator
Fotovoltaica Fotozar 5
Owner
Grupo Zaragozá
Location
San Cebrián de Campos, Palencia, Castilla y León, Spain
First operating
2025
Phases in the tracker
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Grijota solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.