Battery storage · United Kingdom

Grendon Lakes, Grendon - Battery Storage Facility

Operator Statera Energy · Owner Statera Bidco Limited

Operational50 MWData checked 16 November 2026Source record dated 10 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Grendon Lakes, Grendon - Battery Storage Facility is a 50 MW battery storage site 3.2 km south-east of Earls Barton, Northamptonshire, United Kingdom. Its planning application (NW/23/00360/FUL) went to North Northamptonshire on 29 June 2023 and was granted on 29 July 2025. It has been operating since 1 January 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 51 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 12 other sites and 574 energy sites within 40 km for Grendon Lakes, Grendon - Battery Storage Facility

Members see the sites and incidents around this one, and every record behind them.

STATERA ENERGY LIMITED (09840486), active, since 2015. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Statera Energy
Owner
Statera Bidco Limited
Location
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire, NN7 1JW, United Kingdom
Planning authority
North Northamptonshire
Planning application
NW/23/00360/FUL
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NW/23/00360/FUL, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Operational on 16 November 2026.

  • 1 January 2023 Operational
  • 29 June 2023 Planning application submitted
  • 29 July 2025 Planning permission granted

None found. The register holds no published incident that names Grendon Lakes, Grendon - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Grendon Lakes, Grendon - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Grendon Lakes, Grendon - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Grendon Lakes, Grendon - Battery Storage Facility?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Grendon Lakes, Grendon - Battery Storage Facility?
3.2 km south-east of Earls Barton, Northamptonshire, United Kingdom (postcode NN7 1JW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).