Planning pack for this site, £295Other options

Battery storage · United Kingdom

Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage)

Operator Statera Energy · Owner Grendon Storage Limited

Revised49.9 MWData checked 16 November 2026Source record dated 6 April 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage) is a 49.9 MW battery storage site 3.2 km south-east of Earls Barton, Northamptonshire, United Kingdom. Its planning application (NW/21/00623/FUL) went to North Northamptonshire on 15 July 2021 and was refused on 30 September 2021. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 52 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

STATERA ENERGY LIMITED (09840486), active, since 2015. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 101 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells101 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire101 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction115 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Statera Energy
Owner
Grendon Storage Limited
Location
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire, NN7 1JW, United Kingdom
Planning authority
North Northamptonshire
Planning application
NW/21/00623/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NW/21/00623/FUL, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 15 July 2021 Planning application submitted
  • 30 September 2021 Planning permission refused

None found. The register holds no published incident that names Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage). If you know of one, report it (confidential reports are anonymised).

Has Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage)?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 6 April 2022.
Where is Land On The West Side of Main Road Battery Storage (Grendon Lakes - Battery Storage)?
3.2 km south-east of Earls Barton, Northamptonshire, United Kingdom (postcode NN7 1JW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).