← Back to Bedfordshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Green Lane, Stewartby - Solar PV Array

Operator Infinis Solar Developments Limited · Owner Infinis Solar Holdings Limited

Application Submitted30 MWData checked 16 November 2026Source record dated 24 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Green Lane, Stewartby - Solar PV Array is a 30 MW solar farm on the edge of Kempston Hardwick, Bedfordshire, United Kingdom. Its planning application (22/00450/FULWM) went to Bedford on 16 March 2022. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 45 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INFINIS SOLAR DEVELOPMENTS LIMITED (12167687), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Green Lane, Stewartby - Solar PV Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof11 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough29 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering39 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Infinis Solar Developments Limited
Owner
Infinis Solar Holdings Limited
Location
Stewartby Landfill Site Green Lane Stewartby, Bedfordshire, MK43, United Kingdom
Planning authority
Bedford
Planning application
22/00450/FULWM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00450/FULWM, with what the planning evidence pack adds for this site.

Every application in Bedford · Alerts for applications and incidents near here

  • 16 March 2022 Planning application submitted

None found. The register holds no published incident that names Green Lane, Stewartby - Solar PV Array. If you know of one, report it (confidential reports are anonymised).

Has Green Lane, Stewartby - Solar PV Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Green Lane, Stewartby - Solar PV Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Green Lane, Stewartby - Solar PV Array?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 24 March 2022.
Where is Green Lane, Stewartby - Solar PV Array?
On the edge of Kempston Hardwick, Bedfordshire, United Kingdom (postcode MK43).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).