Planning pack for this site, £295Other options

Solar · United Kingdom

Dogsthorpe, Welland Road - Solar Farm & Battery Storage

Operator Infinis Solar Developments Limited · Owner Infinis Solar Holdings Limited

Awaiting Construction14 MWData checked 16 November 2026Source record dated 9 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dogsthorpe, Welland Road - Solar Farm & Battery Storage is a 14 MW solar farm on the edge of Peterborough, Cambridgeshire, United Kingdom. Its planning application (23/01579/FUL) went to Peterborough on 20 November 2023 and was granted on 21 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INFINIS SOLAR DEVELOPMENTS LIMITED (12167687), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dogsthorpe, Welland Road - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 83 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells83 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction132 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire151 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
14 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Infinis Solar Developments Limited
Owner
Infinis Solar Holdings Limited
Location
Dogsthorpe Landfill Site Welland Road Dogsthorpe, Cambridgeshire, PE1 3SA, United Kingdom
Planning authority
Peterborough
Planning application
23/01579/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01579/FUL, with what the planning evidence pack adds for this site.

Every application in Peterborough · Alerts for applications and incidents near here

  • 20 November 2023 Planning application submitted
  • 21 June 2024 Planning permission granted

None found. The register holds no published incident that names Dogsthorpe, Welland Road - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Dogsthorpe, Welland Road - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dogsthorpe, Welland Road - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dogsthorpe, Welland Road - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 July 2024.
Where is Dogsthorpe, Welland Road - Solar Farm & Battery Storage?
On the edge of Peterborough, Cambridgeshire, United Kingdom (postcode PE1 3SA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).