← Back to Bayern
Planning pack for this site, £295Other options

Battery storage · Germany

green flexibility BESS Obergünzburg gmbh

Operator green flexibility development gmbh

Planned39.9 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

green flexibility BESS Obergünzburg gmbh is a 39.9 MW battery storage site in Obergünzburg, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 22 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for green flexibility BESS Obergünzburg gmbh sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-2478, Battery storage unit fire releases gases in Obernzell, Germany, 249 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24782026Battery storage unit fire releases gases in Obernzell, Germany249 kmSignificant
EIR-15862024Third battery fire at Suncycle site in Thuringia344 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre344 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 89.6 MWh, Lithium-Batterie)
Capacity
39.9 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
green flexibility development gmbh
Location
Obergünzburg, Ostallgäu, Bayern, 87634, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names green flexibility BESS Obergünzburg gmbh. If you know of one, report it (confidential reports are anonymised).

Has green flexibility BESS Obergünzburg gmbh had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names green flexibility BESS Obergünzburg gmbh; it holds 17 incidents at battery storage sites in Germany.
What is the status of green flexibility BESS Obergünzburg gmbh?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is green flexibility BESS Obergünzburg gmbh?
In Obergünzburg, Germany (postcode 87634).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).