← Back to Bayern
Planning pack for this site, £295Other options

Battery storage · Germany

green flexibility BESS Ettringen gmbh

Operator green flexibility BESS Nr. 123 gmbh

Planned10 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

green flexibility BESS Ettringen gmbh is a 10 MW battery storage site 5.4 km north of Türkheim, Ettringen, Unterallgäu, Bayern, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 35 other energy sites within 10 km, 7 of them battery storage sites. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for green flexibility BESS Ettringen gmbh sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-2478, Battery storage unit fire releases gases in Obernzell, Germany, 224 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24782026Battery storage unit fire releases gases in Obernzell, Germany224 kmSignificant
EIR-15862024Third battery fire at Suncycle site in Thuringia312 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre312 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 24.4 MWh, Lithium-Batterie)
Capacity
10 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
green flexibility BESS Nr. 123 gmbh
Location
Ettringen, Unterallgäu, Bayern, 86833, Germany
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names green flexibility BESS Ettringen gmbh. If you know of one, report it (confidential reports are anonymised).

Has green flexibility BESS Ettringen gmbh had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names green flexibility BESS Ettringen gmbh; it holds 17 incidents at battery storage sites in Germany.
What is the status of green flexibility BESS Ettringen gmbh?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is green flexibility BESS Ettringen gmbh?
5.4 km north of Türkheim, Ettringen, Unterallgäu, Bayern, Germany (postcode 86833).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).