Solar · United Kingdom
Great Wheatley Road - Solar Farm
Operator Aura Power Solar UK Limited
Under Construction30 MWData checked 16 November 2026Source record dated 17 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Great Wheatley Road - Solar Farm is a 30 MW solar farm in Rayleigh, Essex, United Kingdom. Its planning application (22/00175/FUL) went to Rochford on 17 March 2022 and was granted on appeal on 11 March 2024. Construction started on 1 January 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 65 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Great Wheatley Road - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Great Wheatley Road - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 6.2 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1530 | 2023 | Electrical fault causes solar panel fire in Wickford house | 6.2 km | Minor |
| EIR-1537 | 2021 | Garage fire from overheated solar batteries in South Woodham Ferrers | 6.3 km | Minor |
| EIR-2223 | 2023 | Homeowners allege solar panel fault caused Tolleshunt Knights house fire | 27 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Aura Power Solar UK Limited
- Location
- W/O Great Wheatley Farm, Great Wheatley Road, Rayleigh, Essex, SS6 7AL, United Kingdom
- Planning authority
- Rochford
- Planning application
- 22/00175/FUL
- Appeal reference
- APP/B1550/W/23/3329891
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/00175/FUL, with what the planning evidence pack adds for this site.
Every application in Rochford · Alerts for applications and incidents near here
Timeline
- 17 March 2022 Planning application submitted
- 5 July 2023 Planning permission refused
- 1 September 2023 Appeal lodged
- 11 March 2024 Planning permission granted
- 11 March 2024 Appeal granted
- 1 January 2026 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Great Wheatley Road - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Great Wheatley Road - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Great Wheatley Road - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Great Wheatley Road - Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 June 2026.
- Where is Great Wheatley Road - Solar Farm?
- In Rayleigh, Essex, United Kingdom (postcode SS6 7AL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).