Fairlawns Farm, Chelmsford Road - Battery Energy Storage

Operator Gresham House Devco Pipeline · Owner Gresham House Holdings Limited

Awaiting Construction480 MWData checked 20 November 2026Source record dated 7 November 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Fairlawns Farm, Chelmsford Road - Battery Energy Storage is a 480 MW battery storage site in Rayleigh, Essex, United Kingdom. Its planning application (24/00455/FUL) went to Rochford on 31 July 2024 and was granted on 17 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 61 other energy sites within 10 km, 24 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

GRESHAM HOUSE DEVCO PIPELINE LIMITED (11007494), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fairlawns Farm, Chelmsford Road - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction18 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire176 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells207 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
480 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Gresham House Devco Pipeline
Owner
Gresham House Holdings Limited
Location
Fairlawns Farm, Chelmsford Road, Rayleigh, Essex, SS6 7EW, United Kingdom
Planning authority
Rochford
Planning application
24/00455/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00455/FUL, with what the planning evidence pack adds for this site.

Every application in Rochford · Alerts for applications and incidents near here

  • 31 July 2024 Planning application submitted
  • 17 July 2025 Planning permission granted
  • 17 July 2028 Planning permission runs out

None found. The register holds no published incident that names Fairlawns Farm, Chelmsford Road - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Fairlawns Farm, Chelmsford Road - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fairlawns Farm, Chelmsford Road - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fairlawns Farm, Chelmsford Road - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 November 2025.
Where is Fairlawns Farm, Chelmsford Road - Battery Energy Storage?
In Rayleigh, Essex, United Kingdom (postcode SS6 7EW).