Battery storage · United Kingdom

Great Oak Energy Hub

Operator Clearstone Energy Limited

Awaiting Construction400 MWData checked 16 November 2026Source record dated 6 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Great Oak Energy Hub is a 400 MW battery storage site on the edge of Southwater, West Sussex, United Kingdom. Its planning application (DC/24/1289) went to Horsham on 17 September 2024 and was granted on 28 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

CLEARSTONE ENERGY LIMITED (10270371), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Great Oak Energy Hub sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 75 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction75 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire135 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter221 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Clearstone Energy Limited
Location
Adj To Shipley Road, Southwater, Horsham, West Sussex, RH13 9BQ, United Kingdom
Planning authority
Horsham
Planning application
DC/24/1289

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/24/1289, with what the planning evidence pack adds for this site.

Every application in Horsham · Alerts for applications and incidents near here

  • 17 September 2024 Planning application submitted
  • 28 March 2025 Planning permission granted
  • 28 March 2030 Planning permission runs out

None found. The register holds no published incident that names Great Oak Energy Hub. If you know of one, report it (confidential reports are anonymised).

Has Great Oak Energy Hub had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Great Oak Energy Hub; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Great Oak Energy Hub?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2025.
Where is Great Oak Energy Hub?
On the edge of Southwater, West Sussex, United Kingdom (postcode RH13 9BQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).