Warley Energy Hub, Ockenden - Battery Energy Storage System

Operator Clearstone Energy Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 11 September 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Warley Energy Hub, Ockenden - Battery Energy Storage System is a 0.2 MW battery storage site 3.4 km east of Upminster, Essex, United Kingdom. Its planning application (P1498.24) went to Havering on 11 November 2024 and was granted on 5 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 22 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

CLEARSTONE ENERGY LIMITED (10270371), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Warley Energy Hub, Ockenden - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction12 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire155 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells198 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Clearstone Energy Limited
Location
Warley Energy Hub, St Marys Lane North, Ockenden, Upminster, Essex, RM14 3PA, United Kingdom
Planning authority
Havering
Planning application
P1498.24

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P1498.24, with what the planning evidence pack adds for this site.

Every application in Havering · Alerts for applications and incidents near here

  • 11 November 2024 Planning application submitted
  • 5 August 2025 Planning permission granted
  • 5 August 2030 Planning permission runs out

None found. The register holds no published incident that names Warley Energy Hub, Ockenden - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Warley Energy Hub, Ockenden - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Warley Energy Hub, Ockenden - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Warley Energy Hub, Ockenden - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 September 2025.
Where is Warley Energy Hub, Ockenden - Battery Energy Storage System?
3.4 km east of Upminster, Essex, United Kingdom (postcode RM14 3PA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).