Onshore wind · United Kingdom
Gordonbush (extension)
Operator Scottish and Southern Energy (SSE) · Owner Sse Generation Limited
Operational47 MWData checked 16 November 2026Source record dated 16 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Gordonbush (extension) is a 47 MW wind farm 47 km north of Alness, Highland, United Kingdom. Its planning application (EC00003105) went to Scottish Government (S36) on 1 June 2015 and was granted on 29 September 2017. It has been operating since 1 January 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Gordonbush (extension) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
SSE GENERATION LIMITED (02310571), active, since 1988. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 47 MW (this record)
- All phases
- 117 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish and Southern Energy (SSE)
- Owner
- Sse Generation Limited
- Location
- near Brora in Sutherland., Highland, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- EC00003105
- First operating
- 2021
- Turbines
- 11, 150 m to tip
This record is 47 MW, one part of a site built in phases. With Gordonbush (70 MW) the phases on the register add up to 117 MW. Gordonbush
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EC00003105, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 1 June 2015 Planning application submitted
- 29 September 2017 Planning permission granted
- 1 May 2020 Construction started
- 1 January 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Gordonbush (extension). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Gordonbush (extension) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Gordonbush (extension); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Gordonbush (extension)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 January 2026.
- Where is Gordonbush (extension)?
- 47 km north of Alness, Highland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).