Goonhilly Downs Wind Farm Repower

Operator REG Windpower (previously Cornwall Light & Power)

Operational12 MWData checked 16 November 2026Source record dated 4 July 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Goonhilly Downs Wind Farm Repower is a 12 MW wind farm 7.7 km south-east of Helston, Cornwall, United Kingdom. Its planning application (PA07/02103/FM) went to Cornwall on 21 December 2007 and was granted on 4 August 2008. It has been operating since 1 November 2010. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 98 energy sites within 40 km for Goonhilly Downs Wind Farm Repower

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
REG Windpower (previously Cornwall Light & Power)
Location
Goonhilly Downs Wind Farm, Bonython Manor, Cury Cross Lanes, Helston, Cornwall, TR12 7BA, Cornwall, United Kingdom
Planning authority
Cornwall
Planning application
PA07/02103/FM
First operating
2010
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA07/02103/FM, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 21 December 2007 Planning application submitted
  • 4 August 2008 Planning permission granted
  • 1 August 2010 Construction started
  • 1 November 2010 Operational

None found. The register holds no published incident that names Goonhilly Downs Wind Farm Repower. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Goonhilly Downs Wind Farm Repower had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Goonhilly Downs Wind Farm Repower; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Goonhilly Downs Wind Farm Repower?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 July 2012.
Where is Goonhilly Downs Wind Farm Repower?
7.7 km south-east of Helston, Cornwall, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).