← Back to Lincolnshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Glebe Farm Solar Farm

Operator Stark Energy Limited

Awaiting Construction38.8 MWData checked 16 November 2026Source record dated 25 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Glebe Farm Solar Farm is a 38.8 MW solar farm 7.4 km north-east of Grantham, Lincolnshire, United Kingdom. Its planning application (S25/1194) went to South Kesteven on 17 July 2025 and was granted on appeal on 16 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Glebe Farm Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine14 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby25 kmSignificant
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof46 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
38.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Stark Energy Limited
Location
N/O Glebe Farm, Welby Road, Ropsley, Grantham, Lincolnshire, NG32 3LU, United Kingdom
Planning authority
South Kesteven
Planning application
S25/1194

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S25/1194, with what the planning evidence pack adds for this site.

Every application in South Kesteven · Alerts for applications and incidents near here

Status changed from Application Refused to Awaiting Construction on 16 November 2026.

  • 17 July 2025 Planning application submitted
  • 14 October 2025 Planning permission refused
  • 16 July 2026 Planning permission granted
  • 16 July 2026 Appeal granted
  • 16 July 2029 Planning permission runs out

None found. The register holds no published incident that names Glebe Farm Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Glebe Farm Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glebe Farm Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Glebe Farm Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Glebe Farm Solar Farm?
7.4 km north-east of Grantham, Lincolnshire, United Kingdom (postcode NG32 3LU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).