Solar · United Kingdom
Glebe Farm Solar Farm
Operator Stark Energy Limited
Awaiting Construction38.8 MWData checked 16 November 2026Source record dated 25 August 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Glebe Farm Solar Farm is a 38.8 MW solar farm 7.4 km north-east of Grantham, Lincolnshire, United Kingdom. Its planning application (S25/1194) went to South Kesteven on 17 July 2025 and was granted on appeal on 16 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Glebe Farm Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Glebe Farm Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 14 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0764 | 2024 | Transformer smoking at solar farm in Burton Pedwardine | 14 km | Minor |
| EIR-1265 | 2024 | Solar panels catch fire and destroy three buildings in Harby | 25 km | Significant |
| EIR-1155 | 2024 | Rooftop solar fire contained on a Peterborough warehouse roof | 46 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 38.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Stark Energy Limited
- Location
- N/O Glebe Farm, Welby Road, Ropsley, Grantham, Lincolnshire, NG32 3LU, United Kingdom
- Planning authority
- South Kesteven
- Planning application
- S25/1194
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for S25/1194, with what the planning evidence pack adds for this site.
Every application in South Kesteven · Alerts for applications and incidents near here
Status changed from Application Refused to Awaiting Construction on 16 November 2026.
Timeline
- 17 July 2025 Planning application submitted
- 14 October 2025 Planning permission refused
- 16 July 2026 Planning permission granted
- 16 July 2026 Appeal granted
- 16 July 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Glebe Farm Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Glebe Farm Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Glebe Farm Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Glebe Farm Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Glebe Farm Solar Farm?
- 7.4 km north-east of Grantham, Lincolnshire, United Kingdom (postcode NG32 3LU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).