Solar · United Kingdom

New Earth Solutions West, High Dike - Solar Panels & Battery Srorage

Operator New Earth Solutions (West) Limited

Awaiting Construction4.8 MWData checked 16 November 2026Source record dated 6 June 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

New Earth Solutions West, High Dike - Solar Panels & Battery Srorage is a 4.8 MW solar farm 8.7 km north-east of Grantham, Lincolnshire, United Kingdom. Its planning application (PL/0123/22) went to North Kesteven on 9 November 2022 and was granted on 31 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for New Earth Solutions West, High Dike - Solar Panels & Battery Srorage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells42 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool165 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire168 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
4.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
New Earth Solutions (West) Limited
Location
New Earth Solutions (West) Ltd, Copper Hill Industrial Estate, High Dike, Wilsford, Lincolnshire, NG32 3FH, United Kingdom
Planning authority
North Kesteven
Planning application
PL/0123/22

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/0123/22, with what the planning evidence pack adds for this site.

Every application in North Kesteven · Alerts for applications and incidents near here

  • 9 November 2022 Planning application submitted
  • 31 January 2023 Planning permission granted
  • 31 January 2026 Planning permission expired

None found. The register holds no published incident that names New Earth Solutions West, High Dike - Solar Panels & Battery Srorage. If you know of one, report it (confidential reports are anonymised).

Has New Earth Solutions West, High Dike - Solar Panels & Battery Srorage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New Earth Solutions West, High Dike - Solar Panels & Battery Srorage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of New Earth Solutions West, High Dike - Solar Panels & Battery Srorage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 June 2023.
Where is New Earth Solutions West, High Dike - Solar Panels & Battery Srorage?
8.7 km north-east of Grantham, Lincolnshire, United Kingdom (postcode NG32 3FH).