Planning pack for this site, £295Other options

Solar · United Kingdom

George Mann Way, Hunslet - Solar Panels

Operator TROY FOODS

Awaiting ConstructionData checked 16 November 2026Source record dated 31 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

George Mann Way, Hunslet - Solar Panels is a solar farm 3 km south-east of Leeds, West Yorkshire, United Kingdom. Its planning application (25/07214/DPD) went to Leeds on 17 December 2025 and was granted on 11 February 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 79 other energy sites within 10 km, 59 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for George Mann Way, Hunslet - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2771, Fire involves rooftop solar panels and lithium batteries on Bradford house roof, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof14 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster48 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton62 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
TROY FOODS
Location
1A George Mann Way Hunslet, West Yorkshire, LS10 1DR, United Kingdom
Planning authority
Leeds
Planning application
25/07214/DPD

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/07214/DPD, with what the planning evidence pack adds for this site.

Every application in Leeds · Alerts for applications and incidents near here

  • 17 December 2025 Planning application submitted
  • 11 February 2026 Planning permission granted

None found. The register holds no published incident that names George Mann Way, Hunslet - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has George Mann Way, Hunslet - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names George Mann Way, Hunslet - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of George Mann Way, Hunslet - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2026.
Where is George Mann Way, Hunslet - Solar Panels?
3 km south-east of Leeds, West Yorkshire, United Kingdom (postcode LS10 1DR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).